| Name of plant |
Year |
Operations |
| Melitopol PC “MOIP” |
1997 |
Reconstruction of steam boiler KE-10-14 and its switching to combusting biofuel (sunflower husks) |
| PC “Kirovogradoliya” |
1997 |
Switching steam boiler DKRV-10-13-250 to combusting biofuel (sunflower husks) |
| CC “Alyans-Agro” |
1999 |
Reconstruction of steam boiler E-1,0-0, 9G-3 and its switching to combusting biofuel (buckwheat husks) |
| Town of Alchevsk firm “Vag” |
1999 |
Reconstruction of steam boiler E-1,0-0, 9G-3 and its switching to combusting biofuel (buckwheat husks) |
| OP “Trikratskiy BPP” |
1999 |
Reconstruction of steam boiler DKRV-2,5-13 and its switching to combusting biofuel (buckwheat husks) |
| PC “Skvirskiy BPP” |
1999 |
Reconstruction of steam boiler KE-10-1,4 and its switching to combusting biofuel (buckwheat husks) |
| CC Vinnitskiy OIP |
1999 |
Reconstruction of steam boiler KE-10-1,4 and its switching to combusting biofuel (sunflower husks) |
| CC “Kirovogradoliya” |
2000 |
Reconstruction of steam boiler DKRV-20-13-250 GMD and its switching to combusting biofuel (sunflower husks) |
| CC “Podsolnuch” Poltavskiy OIP |
2000-2002 |
Mountig of stem boiler E-16-2,1-350 for combusting biofuel (sunflower husks) |
| PC “Skvirskiy BPP” |
2000 |
Reconstruction of steam boiler KE-10-1,4 with rising its capacity to 12 tonns steam/h and switching to combusting biofuel (buckwheat husks) |
| PC “Chernovitskiy OIP” |
2001-2002 |
Reconstruction of steam boiler KE-10-1,4 with rising its capacity to 12 tonns steam/h and switching to combusting biofuel (sunflower husks ) |
| “Agroprodukt” town of Nikolaev |
2003 |
Reconstruction and mounting of 2 steam boilers KE-10-14D (E-12—1,4-250 D2) and their switching to combusting biofuel (sunflower husks) |
| Town of Alchevsk firm “Vag” |
2003 |
Reconstruction and mounting of steam boiler KE-10-14D (E-12—1,4-250 D2) and its switching to combusting biofuel (sunflower husks) |
| Town of Ilichevsk “Rusoil Terminal” |
2004-2005 |
Design, mounting, starting-up and adjustment of 2 steam boilers E-12-1,2-250 DV, fuel - biomass |
| Corp, “Sistema SSB”, Kirovograd |
2004-2005 |
Design, mounting, starting-up and adjustment of 2 steam boilers E-12-1,2-250 DV, fuel – biomass (sunflower husks) |
| CC Vinnitskiy OIP |
2004-2005 |
Design, mounting, starting-up and adjustment of steam boiler E-16-3,9-360D, fuel – biomass (sunflower husks) |
| CC “Kirovogradoliya” |
2005-2008 |
Turnkey contract on heat electropower station with steam boilers E-16-3,9-360D and turbine PBS-1,7 MW. Design, mounting, starting-up and adjustment, fuel – biomass (sunflower husks) |
| Institute of Coal Technologies, Ministery of fuel energy |
2007-2008 |
Design of steam boiler E-10-1,4-250, fuel - coal |
| Assosiation of oil extract industry |
2008 |
Design of steam boiler E-25-3,9-360, fuel – sunflower husks |
| “Kargil”, Kcherson BPP, “Kernel Group”, Floare Soarelui” |
2006-2008 |
Design of heat electropower station: steam boilers E-25-3,9-360D, turbine PBS-2,0-4,0- MW. Turnkey preparation to tender. |
| Town of Zaporozye OEP |
2006-2010 |
Design of heat electropower station: capacity 4 MW. Fuel – sunflower husks. Turnkey contract. |